The kitchen floor is looking pretty worn. Also, after having new kitchen benches installed an unfinished part of the floor is now exposed which looks messy. I’d like to have the gaps between boards filled in and a new surface to make it look clean and tidy. Would like the work done in December or January if possible.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
The floor looks so much better. A huge improvement! Was told before I awarded the job that the gaps between boards could not be filled because the boards would move, expand & shrink over time. So the floor didn’t turn out quite as good as I’d hoped, but it came out as expected from our discussion and that was much better than it was beforehand. Happy with end result.
Work carried out by an employee of the company
Reviewed on 03-03-2023
Partner with Builderscrack