Published: 29 April 2020
Timber floor one room --- needs to be coated. Floor sanded and nail holes filled. Floor is original Rimu or Matai. The job is ready to go.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Thanks the floor looks great.
Work carried out by the owner/operator
Reviewed on 03-08-2020
Partner with Builderscrack
Get work