A 1980s built standard 80sqm home is to have the original floor coverings "repaired". The concrete pad has mostly direct fixed low pile carpet product - no underlay - with vinyl. Replacement floor covering is to be faux timber vinyl product throughout. Entry to the property for works assessment/pricing tbc and expected to be from 20 Feb to 25 Feb 2024. Desired completion date of works is 25 Mar 2025, tbc.
#1 | Tradie 1 |
|
9 jobs | No longer in contact |
Partner with Builderscrack
Get work