The timber bathroom floor requires sanding and polishing as it has worn away. The timber is still solid. Bathroom area is shown in image attached. I would like the work done between 21 April and 30 April.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Maxwell was fantastic, he did the job and he was a pleasure to deal with.
Work carried out by the owner/operator
Reviewed on 16-05-2017
Tradesperson reply
"Thanks. A pleasure to work for."
Partner with Builderscrack
Get work