want to install 47 square meters American Oak on the new concrete floor. the subfloor should be grind and have two coats of moisture barrier applied,and then should be installed by direct stick. the floor should be finished with a full Sand,stain and three coats of polyurethane.
#1 | Tradie 1 |
|
73 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 3 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 18 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 5 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 2 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work