We have a number of Rimu t&g floor boards that need replacing. We have already engaged someone to sand and stain the floors next year. Adding some support underneath and removing an old concrete slab that was left after removing a fireplace would be part of the job.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 28-12-2023
Tradesperson reply
"Thanks Josef"
Partner with Builderscrack
Get work