The rimu floor has water and bora damage. The new toilet is being installed so the floor boards need replacing asap, likely to need two boards along the wall and another nearer the centre of the floor. The room is 1800 wide.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Carey's workmanship is excellent, he kept to the quoted cost, turned up on time the morning after the job was posted having procured the necessary materials and explained exactly the intricacies of the job. Well satisfied with the outcome.
Work carried out by the owner/operator
Reviewed on 08-09-2023
Tradesperson reply
"great client easy to deal with thanks Kathryn all the best thank you"