New kitchen cabinets will be installed in next month (estimated 11/Nov at present). Although I discussed with the kitchen designer about the floor before, she said the repair could be done after the installation. However, I do prefer to have the specialist’s opinion, and if the floor needs to be repaired, it would be better to have it done before the installation. Honestly speaking, I have no idea, how it will cost to do the repair.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
What I was impressed with him is that he was very punctual, kept the time he promised, responded promptly and the thorough work.
Work carried out by the owner/operator
Reviewed on 20-12-2022
Partner with Builderscrack
Get work