We're looking to put bamboo flooring down in our kitchen and small living area but need to level the existing floor before we do so. The area is 24 sqm. The existing floor is the concrete slab on which the house is built. It's pretty rough in some areas. We need the job done on Thursday the 23rd or Friday 24th of October. So that we can spend the long weekend laying the floor.
#1 | Tradie 1 | No recent reviews | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work