We have a liminate flooring that needs to be layed. We already have the flooring. Ideally, we would like this done asap (as in before the long weekend), if possible. The space is about 3.8x3.8m and has only a couple of pipes and architraves in the way
#1 | Tradie 1 |
|
108 jobs | No longer in contact |
#2 | Tradie 2 |
|
58 jobs | No longer in contact |
#3 | Tradie 3 |
|
211 jobs | No longer in contact |
Partner with Builderscrack
Get work