Published: 28 April 2020
Removal of floor board approx 2.2 m x 1.2 m to expose the piles so new flooring can be laid. (leak under laundry sink means whole floor needs taking up. Potentially asbestos lino 2 layers under the existing . the only part disturbing this will be the cutting of the floor board to remove. Will not be required to be chipped up or sanded.
#1 | Tradie 1 |
|
118 jobs | No longer in contact |
#2 | Tradie 2 |
|
46 jobs | No longer in contact |
#3 | Tradie 3 |
|
257 jobs | No longer in contact |
#4 | Tradie 4 |
|
211 jobs | No longer in contact |
Partner with Builderscrack
Get work