Replace tiling in toilet with laminate flooring with aim to eventually replace tiling in entranceway, hallway, bathroom and kitchen. Toilet is priority due to hole left in floor after toilet replacement
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Dwayne did a brilliant job and met the scheduled timeframe. Very pleased with the results. And he cleaned up afterwards.
Work carried out by the owner/operator
Reviewed on 27-07-2023
#1 | Tradie 1 |
|
23 jobs | Secured job |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
#4 | Tradie 4 |
|
9 jobs | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work