Closed job

Kitchen flooring

Job image
Job image
Job image
Job image
Job image

Job description

Laminate & Floating Flooring
Auckland

Hi there, I am getting a new kitchen and need the flooring to be done before the toe kicks go in. Dates for flooring install would need to be either 23rd, 24th, 25th, 26th, or 27th June (28th or 29th at a push). I have already chosen the flooring I want from Mitre 10. Kitchen is only about 2.5msq. The flooring is the click clack type. I will remove the old flooring and the cupboards will all be gone from the kitchen during these days.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo