Hi there, I am getting a new kitchen and need the flooring to be done before the toe kicks go in. Dates for flooring install would need to be either 23rd, 24th, 25th, 26th, or 27th June (28th or 29th at a push). I have already chosen the flooring I want from Mitre 10. Kitchen is only about 2.5msq. The flooring is the click clack type. I will remove the old flooring and the cupboards will all be gone from the kitchen during these days.
Partner with Builderscrack
Get work