Review

Installation of Quick-Step Laminate

Job image
Job image
Job image
Job image

Job description

Laminate & Floating Flooring
Auckland

We are in the process of putting in a new kitchen. As part of the installation, we had to remove some of the existing Quick-Step laminate planks to allow the new kitchen to be installed directly onto the concrete subfloor. I am now in need of some expert help to put the planks back in. The new layout is slightly bigger than the previous one, and the position of the fridge and dishwasher have changed, so there are a couple of gaps that need to be filled as well as putting the old planks back. No old planks were damaged during uplift, and I have a full box plus of unused planks from the initial installation in 2016, plus a few extras, so plenty of spares. We're hoping to have the flooring completed in the next couple of weeks, although the earlier, the better, to enable the appliance and kickboards to be installed.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Tyrone was excellent to deal with and did a superb job. I have no hestitation recommending him for similar work.

Work carried out by the owner/operator
Reviewed on 25-10-2022

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo