I have an entry foyer which previously had a water feature installed resulting in the floor sloping towards a drain hole in the centre. I would ideally like to first bulk fill the sloped area to save cost and then use leveling compound across the entire foyer floor.
#1 | Tradie 1 |
|
93 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 9 jobs | No longer in contact |
#3 | Tradie 3 |
|
104 jobs | No longer in contact |
#4 | Tradie 4 |
|
25 jobs | No longer in contact |
Partner with Builderscrack
Get work