Prepare surface, then seal 3m by 4m room floor with sustainable, low VOC product to prevent damp rising in winter. Surface needs to be non slip, though will probably be covered. Job needs to be done in dry autumn weather. Concrete is 10 years old, hand mixed, not smooth. Room has rarely been used. Easy access to outside.
#1 | Tradie 1 |
|
54 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 |
|
112 jobs | No longer in contact |
#4 | Tradie 4 |
|
14 jobs | No longer in contact |
#5 | Tradie 5 |
|
60 jobs | No longer in contact |
Partner with Builderscrack
Get work