Concrete slab, was previously tiled, tiles have been taken up, floor is reasonably level in more places but does need some levelling, floor needs to be levelled, sealed then Oak veneer T&G flooring installed. Job ready now. Rooms will be cleared prior to work starting
#1 | Tradie 1 |
|
73 jobs | No longer in contact |
#2 | Tradie 2 |
|
175 jobs | No longer in contact |
#3 | Tradie 3 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work