Our home is a 1920's Bungalow. We are having our bathroom renovated and keeping the Matai wood floors. A couple of boards need replacing, then the whole floor will need to be sanded back, colour matched and polyurethaned to best match the floor in the adjacent room. Renovation is starting September 28th, I intend to have the builder on the job fit the new floor boards, and have a specialist flooring contractor complete the re-finish after bathroom complete - given the time frame. If you can help with this, I would love to hear from you. If it is possible that you could also do the flooring repair and supply the boards (2 lineal metres, 135ml coloured machined Matai, 19mm), that is even better. Thanks, Rebecca
#1 | Tradie 1 |
|
106 jobs | Secured job |
#2 | Tradie 2 |
|
118 jobs | No longer in contact |
#3 | Tradie 3 |
|
156 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 174 jobs | No longer in contact |
Partner with Builderscrack
Get work