Review

New (deeper) concrete slab for sliding gate tracks

Job image

Job description

Automatic Gates
Howick, Manukau

Published on 19 January 2025

Every summer our sliding gate plays up because the concrete strip / footing the tracks run on is only about 50-80mm deep and worn and cracking. Instead it needs to be 120mm deep. Here is what Chat GPT told me to say: Job Description: We are looking for an experienced tradesperson to: 1. Remove the Existing Footing: Safely remove the old shallow concrete footing for a sliding gate. 2. Install New Footing: Pour a deeper and thicker concrete footing to ensure durability and stability. 3. Ensure Level Surface: Guarantee that the new footing is perfectly level to support smooth gate operation. 4. Reinstall Tracks: Reinstall the gate tracks so that the existing gate motor and sliding mechanism work seamlessly. May need to liaise with a sparky if the gate motor needs to be removed / uninstalled for a period of time... I know a sparky or 3


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo