We have had a deck upgraded but have been unable to get the original rail replaced. The original one still sits on the structure and possibly could be refitted. There are two gaps at each end that do require blocking with a new addition to the rail. The construction of the rail is of galvanised pipe.
#1 | Tradie 1 |
|
36 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 |
|
16 jobs | No longer in contact |
#4 | Tradie 4 |
|
211 jobs | No longer in contact |
Partner with Builderscrack
Get work