I would like to have laid a gravel GAP 65 on a flat walkway of 150 meters in length and 2 m in width. Required a geotextile to be on the track before laying the gravel.
#1 | Tradie 1 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work