Scraping metal off site digging approx 20cu/m clay to give a level site. Load my truck/clay bore 11 x600mm holes 1300 deep and reforming small runnoff drain. 1 to 1.5 days work. Needs 2.5 to 5ton excavator I can hire one. Needs to be done asap.
Partner with Builderscrack
Get work