We have recently built our first home. We require a bob cat or similar and driver to move the resulting piles. Some are clay and concrete off cuts, the largest pile is topsoil and we would like this flattened out and moved approx 5 - 10 metres around a deck. At this stage we require just a quote, perhaps for 4 days? Or even a per day quote? Just putting numbers together for the bank.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 |
|
84 jobs | No longer in contact |
#3 | Tradie 3 |
|
138 jobs | No longer in contact |
#4 | Tradie 4 |
|
6 jobs | No longer in contact |
Partner with Builderscrack
Get work