The car pad has a layer of dirt (about 10cm deep) on top of it that has built up over a period of years. It would be clearing this out. It may include relaying with gravel. The area is 8m x 3m.
#1 | Tradie 1 |
|
139 jobs | Secured job |
#2 | Tradie 2 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work