Active job

Retaining Wall by driving Timber Piles and Concrete Slab for Garage

Job description

Earth-Moving
Wellington

I plan to build a retaining wall by driving the SED poles in the ground. Once the above is done the section (roughly 6m x 4m) needs to back filled and compacted. Thereafter, a 6m x 6m concrete slab will be laid on the top for a double garage.


Trade professionals

#1 Tradie 1 No recent reviews 0 jobs No longer in contact
#2 Tradie 2 No recent reviews 7 jobs No longer in contact
#3 Tradie 3
115 jobs No longer in contact
#4 Tradie 4 No recent reviews 0 jobs No longer in contact
#5 Tradie 5 No recent reviews 6 jobs No longer in contact
#6 Tradie 6 No recent reviews 0 jobs No longer in contact
#7 Tradie 7 No recent reviews 3 jobs No longer in contact
#8 Tradie 8 No recent reviews 96 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo