Published: 17 June 2024
I an looking at drilling and concreting about 10 poles, 300 dia, 6 to 8 meter deep.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The guys rebuilt our sea wall and lifted the land level. Bought in 13 truckloads of hard fill and then top soil. Nothing was an issue for the guys who carried out the work in trying conditions at times. Good ooperators all round. Will use them again and hapily rrecommend them.
Work carried out by an employee of the company
Reviewed on 26-08-2024
Partner with Builderscrack
Get work