Hi, looking to clear the front garden and level it out the best it can without going to the tip more than once. This concrete patio will need to go - it's about 2.8x1.25x0.46m (hopefully break it up into managable pieces and it can just go under the deck. Can start anytime before good friday and preferably drier weather.
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
11 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
#4 | Tradie 4 |
|
3 jobs | No longer in contact |
#5 | Tradie 5 |
|
54 jobs | No longer in contact |
#6 | Tradie 6 |
|
80 jobs | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
#8 | Tradie 8 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work