Have approx 5 metres of fill to be removed currently. Would also like an additional couple of metres of top soil scrapped off & 7 x 400 mm by 800 mm deep post holes dug. In addition need a a section of driveway concrete cut & removed. Work is in preparation to add a car port.
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
#3 | Tradie 3 |
|
3 jobs | No longer in contact |
#4 | Tradie 4 |
|
33 jobs | No longer in contact |
#5 | Tradie 5 |
|
11 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 27 jobs | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
#8 | Tradie 8 |
|
155 jobs | No longer in contact |
Partner with Builderscrack
Get work