Published on 11 February 2024
After getting the gravel driveway concreted I have a large area I need filled. I have a large amount of fill, but we may need more and we will need a lot of top soil to put on top of the clean fill removed from the gravel driveway. I am after a decent finish to the top soil layer so I can mow with a ride on when the grass gets established. I also have two long drains (100m in total estimate) I'd like cleaned up and a small area of the gravel driveway that needs to be raised.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Rate Hayden and his work very highly. A pleasure to deal with and I'll be getting him back to do future projects when they arise.
Work carried out by the owner/operator
Reviewed on 6 May 2024
Partner with Builderscrack
Get work