Need a boulder broken down (it is mix sandstone and rock) and removed and section of driveway pulled up (approx 20sqm --- thick) and removed from site. All is ready to go. Timeframe is asap as contractor that had the job has become uncontactable. Excavator to have rubber tracks and max 4.5 tonne with breaker attachment. Driveway is quite steep.
#1 | Tradie 1 |
|
51 jobs | No longer in contact |
Partner with Builderscrack
Get work