Pole of the letter box has come off due to the windy weather and needs some digging to standup. The existing post (wooden) is in reasonable condition & letter box is in good condition. Needsomeone to do the digging and put the pole inside possibly through cement/etc.
#1 | Tradie 1 |
|
13 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
28 jobs | No longer in contact |
#4 | Tradie 4 |
|
38 jobs | No longer in contact |
Partner with Builderscrack
Get work