Remove approx 1 metre of soil....currently in lawn....to a depth of 100mm. 18 sq metres total. Will only require small rubber tracked digger. We want soil to be taken away. We are along a ROW which is 4 metres wide.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Josh was an excellent communicator, professional and very punctual. The job was completed in an extremely efficient manner. He took great care to clean up after the work was done and he left the site spotless. He is very friendly and reliable. We would have no hesitation in recommending him to anyone needing earthworks, large or small.
Work carried out by the owner/operator
Reviewed on 24-09-2020
#1 | Tradie 1 |
|
14 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
#3 | Tradie 3 |
|
65 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 2 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
#7 | Tradie 7 |
|
15 jobs | No longer in contact |
#8 | Tradie 8 |
|
8 jobs | No longer in contact |
Partner with Builderscrack
Get work