Need a pond dug out at the bottom of my section. No earth will need to be removed off site just pack it in the edge of pond. Length 10m width 5m depth 1-1.5m
#1 | Tradie 1 | No recent reviews | 13 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 5 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
2 jobs | No longer in contact |
#6 | Tradie 6 |
|
58 jobs | No longer in contact |
Partner with Builderscrack
Get work