We need to move about 30-40 cube of soil and clay to another site up the road. Other site is located 5 minutes away - or soil can be taken away all together. As well as fill in a retention tank with drainage metal currently on site. Job needs to be done by the end of this weekend ideally. Can start immediately
#1 | Tradie 1 |
|
79 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 9 jobs | No longer in contact |
Partner with Builderscrack
Get work