Posted 3 years ago
Excavation, fill, post holes and concrete foundations for 70m2 pole barn
Earth-Moving
Ashley, Waimakariri
Excavation, compacted fill, concrete to post holes for 70 m2 pole barn as per plans
1. cut,
2. fill
3. Auger holes and cast in timber posts in conc (we will supply poles and assist with bracing these up to position)
4. dump cut waste onsite in paddock
(construction of slab is to be loaded as separate job on builderscrack)
There will be a couple thickening pads in the middle of the slab somewhere, will confirm and happy to add this on as extra cost at the end.
There is an electric c...