Using a small digger to remove Top Soil, back fill with sand to take Rubber matts under a Playhouse Slides and Swings etc. Lots of other work going Forward, which could be Quoted, at same time.
#1 | Tradie 1 |
|
48 jobs | No longer in contact |
Partner with Builderscrack
Get work