800cubic meters needs moving on a sloped section to get levelled. dirt Is dumped on Ajacent site. Bull dozer or a land plane Etc. End of Aug or Sept.
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work