Posted 5 years ago
Wooldale
Trenching
Tai Tapu, Selwyn
1 trench 90 metres long, 450mm deep, 100mm wide dug in soft BP loess. Paddock is soft and would need a tracked trencher. Second trench for power cable 40 metres long, 700mm deep, 100mm wide in drier area with some tree roots.