500mm deep footing for slab of pole barn required. The barn is a 9x18m rectangle so 54m perimeter. Required to be dug asap, prefer before end of week. The ground is 200mm of pit run laid for the barn and then soft underneath.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very good to deal with and did a great job. Thanks very much.
Work carried out by the owner/operator
Reviewed on 08-03-2016
Partner with Builderscrack
Get work