On around 16.3 m² (8.15 x 2 m): Excavate down to 15 cm and remove excavated soil, Provide and lay 10.2 m of wooden border (H4 RS 200 x 25), Provide and lay 10 cm of compacted ground stone, followed by 5 cm of compacted sand, levelled and graded to around 2°, sloping away from the house
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Harry dug out and laid the foundation for a deck for us. He was far faster than we expected, and the quality of the work was up to our (quite high) expectations. We will definitely get him in to do more jobs.
Work carried out by the owner/operator
Reviewed on 19-02-2024
Tradesperson reply
"Thanks Max. It was a pleasure to get that job completed for you."