Are you available within the next few days and looking for a little side work? We are exploring options for excavating the top layer of soil around our property, removing it, and then laying and levelling new topsoil. The area to excavate (approx 150mm deep) measures about 150m2. The area for laying top soil measures about 300m2.
#1 | Tradie 1 |
|
28 jobs | No longer in contact |
#2 | Tradie 2 |
|
26 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
28 jobs | No longer in contact |
Partner with Builderscrack
Get work