Active job

Rotoiti level land for build ready

Job description

Earth-Moving
Rotorua

Published: 16 May 2024

Land previously had a house on it approximately 15 years ago. A garage is still on the land. The house has been removed. Land is overgrown and needs to be levelled for building. State highway 30 Rotoiti easy access no hills.


Trade professionals

#1 Tradie 1
13 jobs Requesting contact
#2 Tradie 2
5 jobs Requesting contact
#3 Tradie 3
21 jobs Requesting contact
#4 Tradie 4
16 jobs Requesting contact
#5 Tradie 5
27 jobs Requesting contact
#6 Tradie 6
20 jobs Requesting contact
#7 Tradie 7
2 jobs No longer in contact
#8 Tradie 8
2 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo