Dig out to create stepped area for 3 garden beds to be built. Approx 13 meters by 1.5 meter area. Gentle slop. Existing trees near fence. 1 medium lemon tree to remain so need to be careful near that. Will mostlikely removing removing other (bottle brush to the left of lemon). Dig site approx .5 to 1 meter from fence. Not best pics but to give general idea of slop
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
#3 | Tradie 3 |
|
28 jobs | No longer in contact |
Partner with Builderscrack
Get work