Review

Johnny's Pit

Job description

Soil Removal
Rodney

I need to dig a pit for a spa pool. All up, it's about 1 cubic meter of earth that needs dug out, mostly from a 1700mm circle to a depth of 400mm. The earth needs moved to a seperate paddock, about 50m away, by wheel barrow and dumped into some holes.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo