Earhtworks to get building platform Area: 916sqm Floor Area: 242.4 sqM Power, Water, Phone Excavation Cut and fill site @ FPL 17.5 with maximum depth of 200mm topsoil. Excess material to remain on site, excludes uncompactable materials Site Access Supply & spread gap 65 Silt Control Supply & install Retaining Walls 28lm up to 1.5m high max Driveway - 63.8sqM In 100mm thick broom finished concrete Driveway Crossing - In 150mm thick broom finished concrete Patios and Paths - 52.6sqM In 100mm thick broom finished concrete
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
#3 | Tradie 3 |
|
58 jobs | No longer in contact |
#4 | Tradie 4 |
|
6 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
#6 | Tradie 6 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work