Re-cut and shape approx 75m boundary drain. Spoil to be heaped and "lost" on site by owner.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 26-02-2013
Tradesperson reply
"Thank you for the work, it was great working with you."
Partner with Builderscrack
Get work