Active job

Earthworks- Clean Fill, Padfoot Roller

Job image
Job image

Job description

Earth-Moving
Rodney

I need to support an elevated building site with about 2000m3 of clean fill. A trench about 15 -20m length need to be dug at the very bottom to reach solid ground and then filled in with rocks to provide a stable base. Then using a digger and Padfoot roller the fill needs to be benched up to the elevated site. An engineer has been engaged to monitor and sign off the job.


Trade professionals

#1 Tradie 1 No recent reviews 2 jobs No longer in contact
#2 Tradie 2 No recent reviews 17 jobs No longer in contact
#3 Tradie 3 No recent reviews 1 job No longer in contact
#4 Tradie 4 No recent reviews 34 jobs No longer in contact
#5 Tradie 5 No recent reviews 35 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo