I need to support an elevated building site with about 2000m3 of clean fill. A trench about 15 -20m length need to be dug at the very bottom to reach solid ground and then filled in with rocks to provide a stable base. Then using a digger and Padfoot roller the fill needs to be benched up to the elevated site. An engineer has been engaged to monitor and sign off the job.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 17 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
#4 | Tradie 4 | No recent reviews | 34 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 35 jobs | No longer in contact |
Partner with Builderscrack
Get work