We need three or four trenches dug by hand due to a digger unable to access the back section. The dirt would then to be removed off site. The trenches will around 6metres long and variable depths (2.2m, 1.5 m and 1m). Looking for quotes. We are based in Plimmerton/Camborne. Thanks
#1 | Tradie 1 |
|
279 jobs | No longer in contact |
#2 | Tradie 2 |
|
17 jobs | No longer in contact |
#3 | Tradie 3 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work