Tracks on a hilly farm need some love and attention. I'm looking for someone with previous rural/farm track work. Track work involves: - Digging out existing open drain on a farm track (~200m) - see track on RHS of third photo - Creation of open drain on another track(~700-800m) - Installation of culverts in three areas of a farm track (spanning ~200m in three separate sections) Minor earthworks: - shave down a hump on an intersection between two tracks (~40cm high) - shave/fix track cutting that keeps slipping (it's too sharply angled I think) - see RHS track on third photo - creation of ~50m2 flattened/smoothed area on a ridge - some cutting into the hill ~ 0.5m at the very back (area is flatish as is, just want to smooth it out for use to put seats etc on while still having enough gradient on it to drain easily) - see first and second photos for idea of lay of land + idea of location Timeframe is negotiable based on availability and weather. No machinery available on site. Space available to leave machinery onsite (unsheltered). It is a working farm with stock. Materials: I have some existing polythene pipe suitable for culverts - up to the tradesperson as to whether it is enough.
#1 | Tradie 1 |
|
0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 |
|
279 jobs | No longer in contact |
#4 | Tradie 4 |
|
1 job | No longer in contact |
#5 | Tradie 5 | Not reviewed | 2 jobs | No longer in contact |
#6 | Tradie 6 |
|
46 jobs | No longer in contact |
Partner with Builderscrack
Get work