Excavate approximately 135m3 and retaining up to 1.5m using posts and retaining timber. Drainage and back filling along the entire stretch. Approximately 23m in total includes excavating down 200mm from finish height, with base prep and compaction. There is space in the backyard to reallocate some of the excavated dirt for leveling. Photos include red line to indicate where retaining wall would go. We would eventually like to build deck at the top so would like quote to include cost of staircase in the middle of retaining wall. Red circle indicates dirt which needs excavation and red arrows under french door show opportunity for leveling from stepping out of french doors. Questions and viewings welcome.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 |
|
279 jobs | No longer in contact |
#3 | Tradie 3 |
|
43 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 |
|
67 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work